SUPPLIER PPAP/ISIR SUBMISSION REQUEST
Today's Date: |
Requester: |
Department: |
Date for submission: |
SUPPLIER INFORMATION: SUBMISSION INFORMATION:
Supplier Name: |
Timken Part #: |
Program Name: |
Supplier Address: |
Timken Drawing #: |
Revision level: |
Supplier Contact: |
Part name and description: |
|
Submit To Timken Representative: |
Purchase Order (if available): |
REASON FOR SUBMISSION:
Initial Submission: |
Sub-supplier Material/Source Changes: |
Engineering Changes: |
Location Changes: |
Tool Changes/Inactive >1 year: |
Re-submission: |
Process Changes: |
Other (specify): |
SUBMISSION REQUIREMENTS: R-retained; S-submitted LEVEL OF SUBMISSION (Circle one):
Documentation (____ copies) and parts: |
Details |
1 |
2 |
3 |
4 |
5 |
Applicable |
1. Customer/Supplier Design Record |
R |
S |
S |
R |
R |
||
2. Engineering Change Documents |
R |
S |
R |
R |
R |
||
3. Customer Engineering Approval |
R |
R |
S |
R |
R |
||
4. Design FMEA |
R |
R |
S |
R |
R |
||
5. Process Flow Diagram |
R |
R |
S |
R |
R |
||
6. Process FMEA |
R |
R |
S |
R |
R |
||
7. Dimensional results |
R |
S |
S |
R |
R |
||
8. Material Performance Test Results |
R |
S |
S |
R |
R |
||
9. Initial Capabilities Study |
R |
R |
S |
R |
R |
||
10. Measurement System Analysis |
R |
R |
S |
R |
R |
||
11. Qualified Laboratory Documentation |
R |
S |
S |
R |
R |
||
12. Control Plan (prototype/ prelaunch/ process) |
R |
R |
S |
R |
R |
||
13. Part Submission Warrant (PSW) |
S |
S |
S |
S |
R |
||
14. Appearance Approval Report |
S |
S |
S |
R |
R |
||
15. Bulk Material Requirements Checklist |
R |
R |
R |
R |
R |
||
16. Sample Product |
R |
S |
S |
R |
R |
||
17. Master Sample |
R |
R |
R |
R |
R |
||
18. Checking Aids |
R |
R |
R |
R |
R |
||
19. Certificate of Compliance |
R |
R |
S |
R |
R |
APPLICABLE STANDARDS AND SPECIFICATIONS:
Timken Standard/ Specification: Rev: |
Material Standard: |
Customer/Industry Standard: |
|||
Timken/Customer/Supplier Performance Test: |
Owner: |
Performed By: |
Performance Test Results: |
SPECIAL INSTRUCTIONS:
SIGNED:
For Timken: Date: |
For Supplier: Date: |